How Do I Reorder Cadence Steps?

Last updated: November 16, 2026

You can change the order of Cadence Steps only if that Cadence is in Draft status. If the Cadence is in Open status, duplicate the Cadence and then rearrange the Steps before opening the Cadence.

Required permissions:

  • The Coaching Cadences: Create Cadence permission is required to edit a Cadence where you are the Owner.

  • The Coaching: All Access permission is required to edit any Cadence.

Reorder Cadence Steps

  1. Go to Coach --> Cadences, click on the ellipses icon next to the Draft Cadence, and select Edit. Then go to the Steps page.

  2. There are two ways to change the order in which Steps are released:

    1. Click on the ellipses icon next to a Step and select Move Up or Move Down.

    2. Click and drag the grid icon beside a Step name up or down.

  3. Click on Save --> Save as Draft or Save --> Save and Open.


Related Articles